According to Bu Ali Sina Petrochemical Plant, Ardalan Sedaghatzadeh, on
the last day of the 3rd specialized exhibition on support for domestic
manufacturing in the petrochemical industry, said Bu Ali Sina Petrochemical
Plant, the third aromatic unit in the country, reached a production that is 110%
capacity of its nameplate capacity in 11 months of the current calendar year,
which began on March 21 and this volume of production will continue.
He added: "Apart from the continuous increase in production in
previous years, we had several national projects inside the complex, and the sweetening
unit, as the first project, was put into operation this year with confidence in
domestic specialists and Iranian equipment.”
Sedaghatzadeh continued: The project of Paraxylene unit, which had
stopped operation after an incident in 2016 has resumed production by relying
on domestic forces.